Our contract with transport for Greater Manchester has now seen a number of school and college projects coming to fruition. The range and type of projects involved in this contract are extensive from small updates to existing facilities to large-scale transformations including multiple types of cycle parking and services.
Here are a selection of these first projects
Parrs Wood High School
Parrs Wood High school required multiple cycle parking solutions including –
- Bespoke canopy with toast rack cycle stands
- 20 and 60 cycle extended lockable Hamble cycle compounds with cycle lockers
- Cycle lockers
- Lighting
- Security and locking systems
- Groundworks and bollards
East Manchester Academy
For East Manchester Academy we have made alterations to their existing cycle shelters –
- New steel work
- PETG sheeting infill panel
- 2m roof section
- Paxton access control system with fobs
Installation of a 100 cycle lockable Hamble cycle compound including –
- Mesh front
- Sliding gate
- School graphics to end and back panels
- Helmet Lockers
The Kingsway School
The Kingsway School required a bespoke solution that included –
- 38 standard cycle lockers
- 20 double cycle lockers
- Bespoke canopy
- Benches
- Groundworks